GB-Bedford: Bedford Hospital South Wing – Design and build of Electrical Infrastructure Phase 1

Bedfordshire Hospitals NHS Foundation Trust wishes to appoint a Contractor to develop the package of information as a design and build project, developing the design, supply, install, test and commission of a complete substation and all equipment and connections as part of their works for the substation HV4 project at Bedford Hospital South Wing.

The project comprises of the phase 1 upgrade of the electrical infrastructure project to provide a new High Voltage (HV) and principle Low Voltage (LV) distribution system, comprising of a new substation HV4 and housing at Bedford Hospital to provide a system which meets the latest NHS recommendations and supports the future Trust redevelopment plans.

Tender includes the following design package- RIBA stage 4A MEP design and RIBA stage architectural and structural designs.

Organisation Name

Bedfordshire Hospitals NHS Foundation Trust

Value

£5000000

Contract Date

28th Mar 2022 / 30th Sep 2022

Get Quote For Bid Writing Support With This Tender

Sign up to our email mailing list