Fit Out – Lift Steelwork & Glazing -WP12.2.1 – Old Oak Common (S4) Station Re-open

NOTE: THIS IS A RE-OPENED OPPORTUNITY

IF YOU RESPONSED TO THE ORIGINAL ADVERT YOU DO NOT NEED TO RESPOND TO THIS ADVERT.

WP12.2.1 – HS2 Lift Steelwork & Glazing
Scope of Work:
The OOC Station HS2 Scenic Lifts Fit Out package consists of the primary steelwork and cladding to the OOC HS2 station scenic lifts and comprises of the following scope:

• Detailed design, supply and installation of primary steelwork and glazed cladding to 12 scenic + 3 interchange lifts in the HS2 station platforms and concourse area, including provision of brackets, supports and required service holes to interfacing contractors.
• Fully coordinated design with MEPH services, advertising, signage, station common components and lifts contractor, including design of brackets, supports and allowance for service holes.
• Provide RIBA 5 design and construction drawings including connection details, fabrication drawings, general arrangements, and elevation drawings for construction.

Organisation Name

Balfour Beatty VINCI Systra JV

Value

£20000000

Contract Date

1st Jan 2025 / 30th Mar 2028

Get Quote For Bid Writing Support With This Tender

Sign up to our email mailing list