New Build Construction for a Pathology Building at Royal Bournemouth Hospital, Dorset, UK
The scope of works comprises the construction of a new Pathology building together with
stores, external works and drainage.
The new building construction is to be concrete foundations for a structural steel frame with
PCC floors. The external elevations comprise facing or engineering brickwork, with trespa and
aluminum sheet cladding. There are extensive M & E and lift installations within the building,
and a Stores building with all drainage and external works externally
Organisation Name
University Hospitals Dorset NHS Foundation Trust
Contract Date
6th Dec 2021 / 27th Jun 2023