Transport services for Heavy haulage

The supply of transport required for moving large piling rigs and crawler cranes 30T – 100T across the UK, predominantly from Warwickshire to Aylesbury area.

The Haulier should be capable of moving plant items and associated construction equipment, using but not limited to :
Low Loaders
Step Frames

All of the above vehicles should be Euro 6 (3.5T only require min Euro 4) and a minimum FORS silver accreditation. A full 360 onboard camera system externally plus driver facing camera with the ability to record and store footage for 28 days.

In addition, the haulier will be required to use an App for deliveries and the ability to deliver with timed delivery slots.

Regular delivery drivers may also require to take part in a compulsory site induction process.

Ability to add additional insurance on if required.

Suppliers will be assessed on various factors including, but not limited to, Quality, Safety, Experience, Adding Value.
Small Medium Enterprises are actively encouraged within this Project and the promotion of innovation and sustainable working practices.

Bauer Keller is a Joint Venture formed from two of the World's Largest Specialist Geotechnical Contractors.
The Joint Venture allows both companies to work together, providing a wealth of knowledge and experience, using proven, best practice techniques.
We are committed to providing a safe and healthy working environment and we strive to deliver the highest standards, collaborating across disciplines to bring our customers consistently high performance in order to meet their needs.

Organisation Name

BIP SOLUTIONS LIMITED

Contract Date

28th Feb 2022 / 6th Oct 2023

Get Quote For Bid Writing Support With This Tender

Sign up to our email mailing list